The Malappuram Manjeri transmission line was erected to serve the demands of the population. A solution was needed to help with the increased load and enhance power quality.

INTRODUCTION

The existing 30 years old infrastructure was aging and needed an upgradation to carry an increased load and to improve the quality of power. The line had to be converted from 66 kV S/C to 110kV D/C to further improve stability.


Visit: https://www.sterlitepower.com/case-studies/malappuram-manjeri-linha-copy?utm_source=outreach&utm_medium=Blogger&utm_campaign=refferal